Our Digitally Remastered Series are bigger, better and in stunning HD for the very first time! These are the original programmes which have been put through the upscale and remastering treatment with improvements to audio, colour balance, contrast and most of all - picture quality. Some of the trains featured here were never filmed in HD or in broadcast quality. Now, for the first time - you can enjoy just that!
Dahuichang, Tiefa & JiTong Railways, Fuxin, Benxi, Sujiatun & Weihe. 2002 The Chinese Year of the Horse.
Dahuichang Limestone Railway near Beijing with C2 Narrow Gauge 0-8-0's hauling limestone from the quarry to the crusher.
The Tiefa Coal Mine Industrial system with SY 2-8-2's on both passenger and freight.
The JiTong Railway at JingPeng Pass with double headed QJ's on the 2,300 ton freights. Visits to the depot at Chabuga and the line east at Lindong. Plus Yuzhoudi.
The coal mine railway system at Fuxin with its SY 2-8-2s, then Benxi Steelworks with more SY action. The steam workshops at Sujiatun still repairing steam. The narrow gauge forestry railway at Weihe with its daily logging trains and a passenger service too.
Produced by - Belhurst Productions
Running time - 110 minutes
Blu-ray and DVD
Re-released - October 2025